Week 1 Progress

Projected timeline for Project #2

4/03 Create timeline for project.
Draw projected plans/blueprints for bike
Decide on materials/strategy for building

4/10 Buy/Gather wood
Being building
Film building process

4/17 Keep building and filming
Organize footage as the project progresses
4/24 Finish building bike and filming

5/01 Edit footage into short video to accompany the physical project.

5/08 Final CRITIQUE/PROJECT #2 Due


I have two different way of making the bike in mind. The first way I would use dowels of various sizes for the main part of the frame and then cut wheels out of plywood to form the big circular parts. I would use glue and wooden pegs to hold it all together and it would most likely be rideable.

The second option I would like to explore is using branches from actual trees. I would have to hunt for pieces that are close to the actual shape of the frame so I could use as few branches as possible and have nature dictate the form somewhat. This would be much less exact and be more of a show piece than a rideable bike.

I made a general plan for the size of the frame but it is just a guide so I purchase or find the wood to start building with.